Build a Lite-A-Scaffold tower step by step, from checking the ground to locking the castors. You need at least two people. Follow the steps in order, every time.

Before you start

Check the crew and the site before you unload. You need at least two people, and only competent persons should put scaffold up. Stay 4m clear of powerlines unless you have written authority, and at least 1m from an exposed edge. Build on firm ground clear of debris, never on soft ground or unconsolidated soil.

  • On soil, lay sole boards at least 220mm wide
  • Use screw jacks if the ground isn't level
  • Not using jacks? Use base plates on sole boards, or where concrete could be damaged
  • Over 4m to the top platform, a ticketed scaffolder must put it up

1. Fit the jacks to the first frame

Lay the first frame flat and slide a screw jack into each leg. Stand it up with the jacks in place, lifting with your knees, not your back.

2. Brace the frame

One person holds the frame upright. The other fits a cross brace, top end first, then the bottom. Check the frame's toggle locks are locked and vertical. Fit the second brace on the opposite side of the same frame. Every frame is double braced.

3. Lower it and add the next frame

Check every toggle lock is locked, then gently lower the frame so it rests on the free ends of the braces. Bring in the next frame and connect it to those braces. For a longer run, build one bay at a time until you reach the length you need.

4. Level the bay

Lay one plank across the centre of the bay and sit a spirit level on it. Adjust the screw jacks on every frame until the plank is level both ways and the bay is square and parallel to the building. Never extend a jack more than 350mm.

5. Finish the deck

Lay the rest of the planks to complete the platform. A standard bay takes five: the centre plank plus four. For a hatch bay, use the centre plank, two more planks, the ladder hatch and the two short hatch planks. Push the planks to the working face and leave a gap on the outside for the side toe board.

  • Fit a ladder hatch to one bay if you want to climb up through the deck
  • Fix any ladder securely to the ladder access frame and to the ground

6. Add lifts

Finish the whole run at one lift first. Drop a joint pin into the top of every frame leg, sit the next frames on the pins and brace both sides again. Clip each frame to its joint pins with safety clips. Take every bay up a lift before you start the next one.

7. Fit the guard rail posts and rails

Guard rails, mid rails and toe boards are required on any bay more than 1.5m above the ground, including while you build. For a one-bay tower, fit a corner post at each corner of the top platform. For longer runs, add posts at the corners and along the run. Fit top and mid rails to every open side with the toggle locks locked. Work from the platform below, before you lay the top planks.

8. Fit the toe boards

Fit a toe board along the outside edge of the deck. On the wall side, you only need one if the deck sits more than 225mm from the wall. Then fit the end toe boards at both ends so they lock into the side toe board and the end slots in the planks, with no gap in the deck.

9. Lock the castors and do a final check

On castors, push the foot lock down on every wheel before you climb, and re-level and re-lock after every move. Then run through the safety checklist before anyone goes up.

Shop

The parts for the job.

All products

Bracing and connectors

Joint Pin

200mm

$9each

In stock

Platforms and access

Metal Planks

1835 × 220mm

$75each

In stock

Enquiries

Common questions.

Can't find what you're after? Give us a call — we're happy to talk it through.

Two at minimum: one holds the frame while the other fits the braces. Only competent persons should put it up, and anything over 4m to the top platform needs a ticketed scaffolder.

Let's go

Not sure what you need?

Tell us the job and we'll put the parts list together for you.

Get a parts list and a price

Tell us the job, we'll do the counting.

No payment online · No obligation

Follow along

Follow along on Instagram.

New stock, set-ups on site and container arrivals.

© 2026 BYRAX Trade and Supplies

Prices on every product · 1–2 people, no special tools · Kingsgrove warehouse, Sydney

Call nowBuild your scaffold